Introduction

Vaiont Dam (Courtesy of Wikimedia Commons)

The Vaiont Dam (or Vajont Dam), located in the Vaiont River under Monte Toc, 100 km north of Venice, Italy. It is a concrete dam originally built to supply electricity to North-Eastern Italy. The original idea was conceived in 1920 and was authorized on October 15th 1943. Construction began in 1957 and was completed in 1959. The filling of the basin began in February 1960 despite studies lead by experts saying that the entire side of Mt Toc was unstable and would likely collapse into the basin if filled completely.

The Vaiont dam is one of the tallest dams in the world, standing 262m (860ft) high.

A slope stability failure is more commonly known as a landslide, particularly among non-engineers. This type of failure occurs when the weight of a soil mass overcomes the soil’s shear resistance along a failure plane. Water within soil increases its unit weight, while reducing the shear strength. As a result, water and water pressures often play a role in triggering a slope stability failure.

The Vaiont Dam disaster of 1963 was a classic slope stability failure. Ironically, the dam itself did not fail and stands today. The dam is a thin concrete wedge in a narrow gorge. A vast soil mass falling into the reservoir triggered a massive wave that blew over the dam and destroyed villages downstream.

The Vaiont Dam was part of an extensive system of dams, reservoirs, and hydroelectric powerhouses located in the Piave River Valley , high in the Italian Alps. The elements of this system were linked by tunnels and pipelines (Ross 1984, p. 131).

Slope Stability

The first detailed geological studies were carried out in 1959-60 by F. Giudici and E. Semenza. Their detailed geological survey of the slope stability led to the identification of various ancient landslides, only one of which was recognised as potentially dangerous and was situated slightly upstream of the dam. It was in fact, a very fractured zone (named “mylonite”) extending about 1.5 km along the left side of the valley corresponding to the sliding plane of the prehistoric landslide.

Nevertheless, the designers of the dam concluded that a deep-seated landslide was very unlikely to occur, mainly because of both the asymmetric form of the syncline, that was expected to act as a natural break on possible slope movements, and the good quality of in situ rock masses, as derived from seismic surveys. (Genevois 2005, p. 1)

Collapse

After nearly 3 years of sporadic, slow slope movements that first began with the first filling of the reservoir,on the 9th October 1963 at 22.39 local time and during the third reservoir emptying operation, a catastrophic landslide suddenly occurred on the southern slope of Mt. Toc and the whole mass collapsed into the reservoir in less than 45 s. Approximately 270 million cubic meters (353 cubic yards) of rock fell into the reservoir, moving as fast as 25 m/s (82 fps). A tremendous wave of water blew over the dam, virtually the entire reservoir, sending a 70 m (230 ft) wall of water down Vaiont gorge. It destroyed the town of Longarone downstream, and severely damaged or destroyed the hamlets and villages of Villanova, Codissago, Pirago, and Fraseyn. 2,043 people were killed, including 58 of the utility’s employees (Wearne 2000, pp. 213 – 214). The population of Longarone before the disaster had been about 4,600. The flood also knocked out many access routes, hampering rescue operations (Ross 1984, p. 132).

The slide moved a 250 m (820 ft) thick mass of rock about 300 – 400 m (980 – 1300 ft) horizontally. It pushed the old slide mass up the far slope. Trees and soil along the Vaiont Valley were removed as high as 235 m (770 ft) above the reservoir level (Hendron and Patton 1985, p. 8)

The dam, however, stood. It had withstood a force of approximately 4 million metric tons (4 million tons) of water, roughly eight times the force for which it had been designed. The dam is still there, but there is no water behind it (Wearne 2000, p. 217 – 219). There was a small gouge in the concrete about 1.5 by 9 m (5 by 30 ft) along the crest near the left abutment (Ross 1984, p. 132).

The volume of the slide was slightly larger than the working volume of the Vaiont Reservoir. It was more than twice the volume of the largest earthen dam ever built, the Fort Peck Dam on the Missouri River in Montana . Because of the great volume, it was not practical to remove the material from the reservoir to restore the dam’s function (Ross 1984, p. 134).

Other Texts

The key document on this case study is The Vaiont Slide: A Geotechnical Analysis Based on New Geological Observations of the Failure Surface, Volume I, Main Text, Technical Report GL-85-5, published by the U.S. Army Corps of Engineers, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Mississippi (Hendron and Patton 1985). It may be difficult to find except on loan from some large university engineering libraries.

The Vaiont Dam case study is covered in pages 206 through 225 of collapse by Wearne (2000) as well as pages 127 and 130 through 139 of Ross (1984). Wearne’s chapter contains accounts from engineers and survivors of the disaster. Engineering News Record reported on the case in the October 17, 1963 and December 7, 1967 issues, and published an editorial in the October 24, 1963 issue.

A very similar mechanism caused the 2005 Bluebird Canyon landslide near Los Angeles , California . This case is featured on the Modern Marvels Engineering Disasters 17 DVD/video.

This case study is discussed in Chapter 7 of the book Beyond Failure: Forensic Case Studies for Civil Engineers', Delatte, Norbert J., ASCE Press.

Illustrations from Chapter 7 of the book Beyond Failure: Forensic Case Studies for Civil Engineers, Delatte, Norbert J., ASCE Press.

Additional Photos

Additional Links

Return to List of Case Studies (chronological)
Return to List of Courses
Return to Case Studies Project Main Page
Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox